logo
Geotechnics & Pile Testing
03. March 2021

3. DEVELOPMENT AXIS

On location of Gaberke overpass (Škale near Velenje) on the 3. development axis, Pile Dynamic Load Testing (DLT) was performed on bored piles Ø150cm in diameter and different lenghts. The testing was performed with our 21t free fall hammer.

« Back « Back to the list