27. December 2020
SUPERNOVA RUDNIK
From summer 2020, SLP is working on 2 projects: GARAGE “SUPERNOVA-LECLERC” and SUPERNOVA EXPANSION in Ljubljana.
Our engineers performed
Pile Driving Monitoring,
Pile Dynamic Load testing,
Pile Static Load testing and
Pile Dynamic Load testing on reinforced concrete driven cylindrical piles with diameter of 33, 42 and 50cm and length up to 22m.
« Back
« Back to the list